Thank you for visiting this page which features updates on Measure B 2022 construction at San Rafael High School
Click here to view weekly construction updates
Solar Power Coming to San Rafael High School
At its April 15, 2024 meeting, our Board of Trustees approved a project to install solar panel arrays at San Rafael High School. This initiative is an important step towards our district's goal of becoming more sustainable. The two new solar arrays, with a combined capacity of 499 kilowatts, are expected to save the district an estimated $2.5 million over their lifetime. These savings will be used to fund other important programs and projects for our students. Construction is scheduled to begin in September 2025 and is expected to be completed in March 2026.
- San Rafael High School Aquatic Center Construction Management Plan
- San Rafael High School Supplemental Environmental Impact Report Board Adopted 05/13/24
- San Rafael High School and Madrone Construction Update Letter English May 15, 2024
- San Rafael High School and Madrone Construction Update Letter Spanish May 15, 2024
- San Rafael High School Security and Perimeter Fencing Project
-
-
-
-
-
-
-
San Rafael City Schools is preparing an Environmental Impact Report (EIR) for the proposed expansion and reconstruction at the San Rafael High School campus located at 150 3rd Street in San Rafael. The California Environmental Quality Act (CEQA) requires that the District conduct an environmental review of the project, which has the potential to result in physical change in the environment.
The District has determined that an EIR will be the required CEQA document for the project. The District is issuing a Notice of Preparation (NOP) to invite comments on the scope and content of the EIR prior to its preparation. Click here to download the NOP.
Responses to this NOP and any related questions or comments regarding the scope or content of the draft EIR must be directed in writing to: William Savidge, San Rafael City Schools, 310 Nova Albion Way, San Rafael, CA 94903 or by email to: bsavidge@kl2schoolfacilities.org. Comments on the NOP must be received at the above mailing or e-mail address by July 24, 2023 at 5 p.m.
2017 Final SRHS Campus Environmental Impact Report
After a nine-month development and review process, San Rafael City Schools has prepared a final Environmental Impact Report (EIR) for the proposed expansion and reconstruction at the San Rafael High School campus. The California Environmental Quality Act (CEQA) requires that the District conduct environmental review of the project, which has the potential to result in physical change in the environment. Click here to download the final EIR. (Note: The large file size may impact download time.)
-
-
-
-