San Rafael High School Measure B 2022

Thank you for visiting this page which features updates on Measure B 2022 construction at San Rafael High School

 

 

Click here to view weekly construction updates

 

 

Architectural rendering of a modern building with a red and brown facade under a blue sky.

 

Click HERE to view the flyover video for the design of the SRHS Visual and Performing Arts Building Replacement Project

Click here to view the presentation from the August 28, 2025 meeting on the design of design of the SRHS Visual and Performing Arts Building Replacement Project 

 

An aerial view shows renderings of new solar arrays in a community.

Solar Power Coming to San Rafael High School

At its April 15, 2024 meeting, our Board of Trustees approved a project to install solar panel arrays at San Rafael High School. This initiative is an important step towards our district's goal of becoming more sustainable. The two new solar arrays, with a combined capacity of 499 kilowatts, are expected to save the district an estimated $2.5 million over their lifetime. These savings will be used to fund other important programs and projects for our students. Construction is scheduled to begin in September 2025 and is expected to be completed in March 2026.

 

 

 

  • Please join us for a meeting about San Rafael High School Capital Improvement Projects on October 19, 2023 from 6-7 p.m. at San Rafael High School Student Commons building, 150 Third Street.

    Learn more by clicking the image below:

    A notice announcing a public scoping meeting for San Rafael High School Campus Capital Improvements Project, scheduled for Thursday, October 19, 2023, at 6:00-7:00 PM in the Student Commons of San Rafael High School.

  • San Rafael City Schools is preparing an Environmental Impact Report (EIR) for the proposed expansion and reconstruction at the San Rafael High School campus located at 150 3rd Street in San Rafael. The California Environmental Quality Act (CEQA) requires that the District conduct an environmental review of the project, which has the potential to result in physical change in the environment.

    The District has determined that an EIR will be the required CEQA document for the project. The District is issuing a Notice of Preparation (NOP) to invite comments on the scope and content of the EIR prior to its preparation. Click here to download the NOP.

    Responses to this NOP and any related questions or comments regarding the scope or content of the draft EIR must be directed in writing to: William Savidge, San Rafael City Schools, 310 Nova Albion Way, San Rafael, CA 94903 or by email to: bsavidge@kl2schoolfacilities.org. Comments on the NOP must be received at the above mailing or e-mail address by July 24, 2023 at 5 p.m.  


    2017 Final SRHS Campus Environmental Impact Report 
    After a nine-month development and review process, San Rafael City Schools has prepared a final Environmental Impact Report (EIR) for the proposed expansion and reconstruction at the San Rafael High School campus. The California Environmental Quality Act (CEQA) requires that the District conduct environmental review of the project, which has the potential to result in physical change in the environment. Click here to download the final EIR. (Note: The large file size may impact download time.)


    View the 2017 Draft SRHS Campus Environmental Impact Report

  •